County & Miami DDA Join Environmental Stakeholders In Addressing Back Bay Study Pitfalls

The U.S. Army Corps of Engineers is proposing a $4.6 billion investment to address storm surge risk in our region. This proposal, called the “Back Bay Study,” proposes a range of “grey” infrastructure options like seawalls and flood gates, but largely leaves out nature-based solutions like mangrove and restoration and living shorelines. You can read […]

Back

The U.S. Army Corps of Engineers is proposing a $4.6 billion investment to address storm surge risk in our region. This proposal, called the “Back Bay Study,” proposes a range of “grey” infrastructure options like seawalls and flood gates, but largely leaves out nature-based solutions like mangrove and restoration and living shorelines. You can read the full proposal HERE.

Miami-Dade County as well as the Miami Downtown Development Authority (Miami DDA) recently submitted formal letters to the U.S. Army Corps of Engineers (USACE) advocating for nature-based features (NNBF) as alternatives to the Corps’ proposed seawalls and flood gates as well as consideration of the detrimental economic impact of such grey infrastructure. Both the County and Miami DDA’s letters echo some of the concerns of community partners, including Miami Waterkeeper. The Miami DDA’s letter also includes renderings visualizing the differences among proposed seawalls and nature-based alternatives. 

(Source: Back Bay Proposal Renderings, provided by Miami DDA)

 

The USACE’s Back Bay Study falls short in a number of ways. To begin, it does not prioritize community equity across Miami-Dade County, particularly as under-resourced communities are on the frontlines of the climate crisis. Additionally, the Plan does not consider nature-based solutions (NNBFs) and rather favors ‘grey-infrastructure’ as a preliminary solution to increased flooding and storm surge. In sum, in its current form, the project creates equity problems, exposes areas to increased flooding, and does not address chronic flooding. 

 

The DDA’s letter stresses that the Tentatively Selected Plan (TSP), as proposed now, “will have an overwhelmingly detrimental effect on the entire waterfront area of Miami DDA district as well as greater Downtown and the County.” The letter also states proposed flood walls south of the river would render certain infrastructure “obsolete,” and emphasizes that given our porous limestone bedrock, erecting flood walls as proposed could exacerbate flooding conditions especially due to sea level rise. The County’s letter requests inclusion of additional NNBFs in the TSP, and emphasizes the necessity of equitable investments to address storm surge risk across all neighborhoods. 

 

Environmental stakeholders Ocean Conservancy and the Tropical Audubon Society have also recently submitted formal letters to the USACE. These letters urge the Corps’ consideration of NNBFs, prioritization of community equity, and attention to marine life health and longevity in light of the recent fish kill event in Biscayne Bay. Read their letters HERE and HERE, respectively.

 

Public comment period on the Back Bay Study closed August 19, 2020.

Read Miami-Dade County’s full letter HERE.

Read the Miami DDA’s full letter HERE.

For more information on this topic, click HERE.

Originally published at https://www.miamiwaterkeeper.org/county_miami_dda_join_environmental_stakeholders_in_addressing_back_bay_study_pitfalls

Tags:

Get updates about our work

We respect your privacy.

Media Coverage

Stories of Accountability & Recovery

Miami Waterkeeper has been cited by local and national outlets as a trusted source on South Florida water quality, policy, and environmental justice.

The Washington Post

An Army Corps project could wipe out one of Florida’s last thriving coral reefs

March 1, 2026

The Washington Post ran an in-depth feature on the U.S. Army Corps of Engineers’ plans to dredge and widen the shipping channel at Port Everglades —…

Read more

Nautical Voice

Concerns Rise Over Port Everglades Expansion’s Impact on Coral Reefs

January 19, 2026

NV Tech Desk reported on the scientific alarm surrounding the Port Everglades expansion, highlighting a landmark study by NOAA and the Shedd Aquarium that…

Read more

The Invading Sea

Trashing our oceans: Feds plan the biggest permitted coral destruction in US history

January 8, 2026

The Invading Sea, Florida’s dedicated climate journalism outlet, published a stark account of what the Port Everglades dredge proposal actually entails: 400 underwater acres…

Read more

Support our work

We’re committed to transparency, accountability, and maximizing the impact of every dollar entrusted to us. Be part of the change and donate today!

Florida Solicitation of Contributions Registration #CH46021 A copy of the official registration and financial information for Biscayne Bay Waterkeeper (aka Miami Waterkeeper), a Florida-based nonprofit organization, may be obtained from the Division of Consumer Services by calling toll-free 1-800-HELP-FLA (435-7352) within the state or visiting www.800HELPFLA.com. Registration does not imply endorsement, approval, or recommendation by the state.